EAL Learn+, part of the Enginuity Group
Introduction to Plumbing · 30-hour short courseUnit 04 · Tools and kit
← Previous unitCourse homeIntroduction to PlumbingUnit 05 · Qualifications →
Introduction to Plumbing · Unit 04

Tools and
what you need

You do not need a van full of tools to start. You need about thirty things, most of which cost under twenty pounds, and the discipline to add to them steadily rather than buying a shiny power tool you will use twice. This unit is the honest list, with prices, and a builder so you can see what your own kit would cost.

Unit04 of 06
Study time4 hours
CoversTools · PPE · budgets
Questions8 marks
01

Who buys what

Ask before your first day
You buy

Hand tools

Spanners, cutters, pliers, levels, screwdrivers, your torch. These are personal tools and they follow you from job to job and employer to employer.

Usually the employer

Plant and power

SDS drills, pipe freezers, press tools, pressure testing kit, wet vacs, drain rods, ladders and anything that needs testing or calibrating.

Legally the employer

PPE

Where personal protective equipment is needed for the work, the employer must provide it free of charge. That includes boots, gloves, eye protection and hearing protection.

Ask on day one
“What am I expected to turn up with?” is a completely reasonable question and no employer will think less of you for asking it. Some hand you a starter kit. Some expect a basic bag. Nobody expects a first-year apprentice to own a press tool.
02

Build your kit

Tick what you would buy

Everything marked Core is something you will reach for in your first fortnight. Everything marked Later can wait until you know you need it. Start with the core, and watch what the total does.

The realistic plan

£50 to £100 a month

Most apprentices build a kit over six to eight months rather than in one trip. Buy the core list first, then add the thing you had to borrow this week. A tool you have borrowed twice is a tool you should own.

Buy once

Cheap where it does not matter

Buy quality on the things you hold all day and the things that will ruin a job if they fail: pipe slices, water pump pliers, a good level, your boots. Buy cheap on the things that get lost: tape measures, pencils, bleed keys.

03

PPE and the law

Not optional, not yours to pay for

Personal protective equipment is the last line of defence, used when the risk cannot be designed out. The employer must assess what is needed, provide it free, keep it maintained and make sure it is used. On a construction site you will not get past the gate without the basics.

What you will be wearing, and why
ItemProtects againstWhen
Safety bootsDropped fittings, nails through the sole, crush injuriesEvery site, every day
Safety glassesHot solder, flux spatter, drilling debris, system water under pressureSoldering, drilling, breaking into a system
GlovesCuts from cut pipe ends, hot pipework, contaminated waterMost tasks, off for fine work
Knee padsBursitis — a genuine career-ending injury in this tradeAnything at floor level, which is most of it
Ear defendersHearing loss from SDS drilling and cuttingPower tools in an enclosed space
Dust mask (FFP3)Silica dust from chasing walls, old insulationChasing, drilling masonry, lofts
Hard hat and hi-visSite hazards and being seenCommercial sites, as a condition of entry

Knees. More plumbers leave the trade because of their knees than for any other physical reason. Knee pads cost about twenty pounds and a working pair of knees is worth the rest of your career. Wear them from your first week, not from the week they start hurting.

04

Looking after it all

Tools, vans and theft
Mark it

Make it identifiable

Paint mark, engrave or UV-mark every tool. Stolen tools are almost never returned without a way of proving they are yours.

Empty it

Nothing in the van overnight

Most tool insurance policies exclude theft from an unattended vehicle overnight, or cap it at a few hundred pounds. Read the wording before you find out the hard way.

List it

Keep a record

Photograph the kit, keep the receipts and serial numbers in one place. It turns a painful insurance claim into a form-filling exercise.

Maintain it

Blades and batteries

A blunt pipe slice crushes copper instead of cutting it. Wheels are a couple of pounds. Change them before the joint you make with a crushed pipe end starts to weep.

05

Check what you have taken in

8 marks
Q1Who pays for PPE2 marks

An employer tells an apprentice to buy their own safety boots and glasses out of their wages. What is the position?

Q2Tool condition2 marks

Why does a worn cutting wheel on a pipe slice cause leaking joints?

Q3Building the kit2 marks

A kit totals £520 and the apprentice can put £75 a month towards it. How many months does it take to buy the whole kit?

months
Q4Tools in the van2 marks

Why do experienced plumbers empty the van every night?

Unit 04 marks0/8
Not started
EAL Learn+, part of the Enginuity Group

Produced for EAL Learn+.
Introduction to Plumbing — a 30-hour pre-apprenticeship short course.