EAL Learn+, part of the Enginuity Group
Introduction to Plumbing · 30-hour short courseUnit 03 · Materials and pipework
← Previous unitCourse homeIntroduction to PlumbingUnit 04 · Tools →
Introduction to Plumbing · Unit 03

Materials
and pipework

Copper or plastic. Solder or compression. Solvent weld or push-fit. Every one of those decisions changes what a job costs, how long it takes and whether it leaks in five years. This unit covers the materials you will handle every week and the jointing methods that go with them — then lets you price a pipe run yourself.

Unit03 of 06
Study time5 hours
CoversPipe · fittings · jointing
Questions10 marks
01

What pipe is made of

Five materials, five jobs
The materials you will meet on a domestic job
MaterialUsed forSizesWhy you would pick it
Copper
BS EN 1057
Hot and cold supply, heating 15 / 22 / 28 mm Rigid, takes heat, holds its shape, looks right where it is on show, and lasts fifty years or more. Sold in 2 m and 3 m lengths — use 3 m where you can, because fewer joints means fewer leaks.
Plastic push-fit
PB or PEX, barrier pipe
Hot and cold supply, heating 10 / 15 / 22 / 28 mm Fast, no flame, bends round obstacles and tolerates a little freezing without splitting. Needs a pipe insert in every cut end and far more clips than copper.
MDPE
blue, underground
Incoming water main 20 / 25 / 32 mm The blue coil that runs from the boundary into the house. It is blue specifically so anyone digging knows it is drinking water.
PVC-u / ABS waste Above-ground waste 32 / 40 / 50 mm Light, cheap, joins by solvent weld or push-fit ring seal. Different plastics need different solvent cements — check before you glue.
PVC-u soil WCs and the stack 110 mm The big one. Push-fit with a rubber seal, which also lets it expand and contract without cracking.
How pipe is sized in the UK
Supply pipe is named by its outside diameter, so 15 mm copper measures 15 mm across the outside and about 13.6 mm inside. Waste pipe is also named by outside diameter, but the imperial and metric ranges are not interchangeable — an old 1½ inch waste is not the same as 40 mm, and forcing the two together is a classic way to create a slow leak inside a cupboard.
02

Five ways to join a pipe

And when each one is right
Jointing methods for 15 mm copper
MethodFlame?Can be undoneFitting costWhere it belongs
CompressionNoYes£1.50 – £4.00Accessible places — under a sink, at an appliance, anywhere you may need to break the joint later.
Solder ring
Yorkshire
YesNo£0.80 – £2.00Neat permanent work on show. The solder is already in the fitting, so it is quick and consistent.
End feedYesNo£0.30 – £1.00High-volume first fix. Cheapest fitting there is, but you feed the solder yourself, so it rewards practice.
Push-fitNoYes£2.00 – £5.00Speed, awkward corners, and anywhere a flame is a bad idea — a loft full of insulation, a floor full of joists.
PressNoNo£4.00 +Commercial work. A battery tool crimps the fitting in two seconds. The tool costs four figures, which is why you rarely see it on domestic.

The rule that matters more than the method. Never bury a joint that can be undone. Compression and push-fit joints are designed to be accessible; put one under a screed floor or behind a tiled wall and you have built a leak you cannot reach. Buried and inaccessible runs should be unbroken pipe, or soldered.

03

Which joint would you use?

Six real situations

Pick a situation and see what an experienced plumber would reach for, and why.

Jointing method chooserChoose the situation, not the fitting
04

Holding it up

Clip spacing

Unsupported pipe sags, rattles and eventually leaks at the joints. Plastic needs far more support than copper because it is flexible — a plastic run clipped like copper will look like a hammock by the second winter.

Maximum clip spacing
PipeHorizontalVertical
Copper 15 mm1.2 m1.8 m
Copper 22 mm1.8 m2.4 m
Copper 28 mm1.8 m2.4 m
Plastic 15 mm0.3 m0.5 m
Plastic 22 mm0.5 m0.8 m
Also remember

Expansion

Hot pipe grows. A long straight heating run needs somewhere to take that movement, or it will tick and creak every time the boiler fires. Leave it slightly loose through joists and never clamp it rigid at both ends of a long run.

Also remember

Insulation

Any pipe in a loft, a garage or an unheated void gets lagged — not to save energy, but to stop it freezing and splitting. It is the cheapest thing on the van and the most expensive thing to leave off.

05

Price a pipe run

Materials only — labour comes in Unit 06

Set up a run and watch the material cost move. Change the jointing method and you will see why the choice is not only a technical one. Prices are typical merchant figures for 2026.

Slide to 0 to price the run without clips and see what you would be leaving off.

Pipe£0
Fittings£0
Clips & sundries£0
Materials total£0

Sundries covers solder, flux, PTFE, jointing compound and pipe inserts — small money individually, but it is on every job and it is the first thing people forget to price.

06

Check what you have taken in

10 marks
Q1Buried pipework2 marks

A 15 mm run has to be chased into a wall and plastered over. Which jointing approach is right?

Q2Plastic pipe2 marks

What is the pipe insert for, in a plastic push-fit joint?

Q3Clip spacing3 marks

An 8.4 m horizontal run of 15 mm copper is clipped at the maximum permitted spacing. How many clip intervals are there along the run?

intervals
Q4Material take-off3 marks

Price the materials for a 14 m run of 15 mm copper with 10 solder ring fittings at £1.40 each. Pipe is £3.50 per metre. Ignore clips and sundries, but add 10% for waste. Give your answer to the nearest pound.

£
Unit 03 marks0/10
Not started
EAL Learn+, part of the Enginuity Group

Produced for EAL Learn+.
Introduction to Plumbing — a 30-hour pre-apprenticeship short course.